-
Complete Pegah unit (3 hoses), can be installed on the floor Equipped with a speed control gauge Has 3 hoses Can be installed on the ground Seat electric motors: Hanning, Germany, 2015 American hoses 5 Italian electric valves Electronic components from Germany, Japan, Korea and Taiwan Made in Iran 2 years warranty
توضیحات